Bukit Timah Expressway
BKE traffic.
Know before you go.
North-western journeys and road approaches towards Woodlands.
BKE AT A GLANCE
The BKE is the 10 km road to the Causeway: it runs from the PIE at Bukit Timah, past Bukit Panjang and the Mandai area, to Woodlands Checkpoint. On the way it connects with the KJE and SLE.
Live LTA reports and segment travel times for the BKE are further down, followed by weather along the route and the order of its interchanges.
BKE RIGHT NOW
BKE status now
Server snapshot · incidents: retrieved 29 Nov, 12:56 SGT · travel times: retrieved 29 Nov, 12:58 SGT
| Expressway | LTA incident reports on the road | End-to-end LTA estimate |
|---|---|---|
| BKE Bukit Timah Expressway | 2 Roadwork | towards PIE: 10 min (6 segments) towards WOODLANDS CENTRE: 10 min (7 segments) |
Reports are counted when LTA’s message says the incident is on that road. End-to-end time is the sum of LTA’s published segment estimates in each direction, not a door-to-door prediction.
Use the checkpoint cameras alongside BKE incidents. A clear approach does not establish how long immigration will take.
Reports mentioning BKE
Server snapshot · retrieved 29 Nov, 12:56 SGT (source gives no event time)
2 reports — Roadwork 2.
RoadworkLane affected(29/11)09:27 Road Works on BKE (towards W'lands) after Bukit Panjang Rd. Avoid lane 3.
View incident location ↗RoadworkWorks(29/11)08:39 Road Works on BKE (towards W'lands) at SLE Exit.
View incident location ↗Source: LTA DataMall. Coverage & data policy. Singapore Open Data Licence.
BKE travel-time segments
Server snapshot · retrieved 29 Nov, 12:58 SGT (source gives no event time)
BKE towards PIE
| From | To | LTA estimate |
|---|---|---|
| WOODLANDS CENTRE | BKE/SLE INTERCHANGE | 1 min |
| BKE/SLE INTERCHANGE | MANDAI RD | 1 min |
| MANDAI RD | BKE/KJE INTERCHANGE | 2 min |
| BKE/KJE INTERCHANGE | BUKIT PANJANG RD | 2 min |
| BUKIT PANJANG RD | DIARY FARM ROAD | 1 min |
| DIARY FARM ROAD | BKE/PIE INTERCHANGE | 3 min |
| Sum of the 6 published segments | 10 min | |
BKE towards WOODLANDS CENTRE
| From | To | LTA estimate |
|---|---|---|
| BKE/PIE INTERCHANGE | DIARY FARM | 2 min |
| DIARY FARM | BUKIT PANJANG RD | 1 min |
| BUKIT PANJANG RD | BKE/KJE INTERCHANGE | 2 min |
| BKE/KJE INTERCHANGE | MANDAI RD | 2 min |
| MANDAI RD | BKE/SLE INTERCHANGE | 1 min |
| BKE/SLE INTERCHANGE | WOODLANDS AVE 3 | 1 min |
| WOODLANDS AVE 3 | WOODLANDS CENTRE | 1 min |
| Sum of the 7 published segments | 10 min | |
KJE towards BKE
| From | To | LTA estimate |
|---|---|---|
| SUNGEI TENGAH | CHOA CHU KANG WAY | 1 min |
| CHOA CHU KANG WAY | WOODLANDS RD | 1 min |
| WOODLANDS RD | BKE/KJE INTERCHANGE | 2 min |
| KJE/PIE INTERCHANGE(JALAN BAHAR FLYOVER) | SUNGEI TENGAH | 3 min |
| Sum of the 4 published segments | 7 min | |
KJE towards PIE
| From | To | LTA estimate |
|---|---|---|
| BKE/KJE INTERCHANGE | WOODLANDS RD | 2 min |
PIE towards CHANGI AIRPORT
| From | To | LTA estimate |
|---|---|---|
| BUKIT TIMAH RD | PIE/BKE INTERCHANGE | 3 min |
| PIE/BKE INTERCHANGE | ENG NEO AVE | 2 min |
| Sum of the 2 published segments | 5 min | |
PIE towards PIE/AYE INTERCHANGE
| From | To | LTA estimate |
|---|---|---|
| ENG NEO AVE | PIE/BKE INTERCHANGE | 2 min |
| PIE/BKE INTERCHANGE | CLEMENTI RD | 1 min |
| Sum of the 2 published segments | 3 min | |
SLE towards BKE
| From | To | LTA estimate |
|---|---|---|
| WOODLANDS AVE 2 | BKE/SLE INTERCHANGE | 2 min |
| CTE/SLE INTERCHANGE | YISHUN | 2 min |
| YISHUN | UPPER THOMSON | 2 min |
| UPPER THOMSON | MANDAI RD | 3 min |
| MANDAI RD | WOODLANDS AVE 12 | 1 min |
| WOODLANDS AVE 12 | WOODLANDS AVE 2 | 1 min |
| Sum of the 6 published segments | 11 min | |
SLE towards CTE
| From | To | LTA estimate |
|---|---|---|
| BKE/SLE INTERCHANGE | WOODLANDS AVE 2 | 2 min |
Segment estimates are published by LTA for the listed points. The sum is arithmetic on those estimates, not a guaranteed door-to-door time.
Source: LTA DataMall. Coverage & data policy. Singapore Open Data Licence.
Check the next part of your trip.
Connecting roads may tell a different story.
ROAD FACTS
BKE facts
| Official name | Bukit Timah Expressway |
|---|---|
| Length | 10 km |
| Opened | 1985–1986 |
| Ends | Bukit Timah — meets the PIE Woodlands Checkpoint — the Johor–Singapore Causeway |
| Areas served | Bukit Timah, Bukit Panjang, Mandai / Sungei Kadut, Woodlands |
| Connects with | PIE, KJE, SLE |
| Operated by | Land Transport Authority (LTA) |
| Charges | No toll booths. Road pricing applies only at specific ERP charging points and times. LTA plans to end gantry-based charging on 31 December 2026 and switch to ERP 2 with on-board units on 1 January 2027 (LTA). See ERP rates and planning. |
WEATHER ALONG THE ROUTE
Weather along the BKE
NEA 2-hour forecast areas along the BKE, listed south → north.
Forecast points, in route order: Bukit Timah → Bukit Panjang → Mandai → Woodlands. The current NEA 2-hour forecast for each point is added by the server when NEA responds; if not, see the NEA weather page or the rain and road checker.
Temperature, rain and wind at the start, middle and end
The detailed point forecast was not available when this page was generated.
Heavy rain can cause ponding and lower visibility, but a forecast is not a road closure. For official flood warnings see PUB flood alerts.
ROUTE ORDER
BKE interchanges and main exits
- PIE South end · Bukit Timah
- Exit 2 · Dairy Farm Rd / Upper Bukit Timah Rd
- Exit 3 · Bukit Panjang / Choa Chu Kang Rd
- KJE Exit 5 · Gali Batu
- Exit 7 · Mandai Rd
- SLE Exits 8–9
- Exit 10A · Woodlands Ave 3
- Exit 10B · Woodlands Rd / Woodlands Centre Rd
- North end · Woodlands Checkpoint
Order: south → north. Exit numbers are as listed in published exit tables; on-road LTA signage is authoritative.
Tunnels, bridges and notable structures
- Eco-Link@BKE — a 62 m wildlife bridge across the expressway, opened in 2013, connecting two nature reserves
- Woodlands Checkpoint Viaduct
Practical notes for this road
- Queues for the Causeway can extend back onto the BKE. Compare BKE reports with the Woodlands camera views before committing.
- The Tuas route (AYE) is the alternative crossing; the comparison page shows both checkpoints side by side.
Woodlands Checkpoint cameras and crossing rules →
Reference sources: Wikipedia: Bukit Timah Expressway · LTA: Expressways. Reviewed 2026-11-01.
BKE questions
Where does the BKE start and end?
Bukit Timah — meets the PIE; Woodlands Checkpoint — the Johor–Singapore Causeway. Interchanges are listed above in south → north order.
How long is the BKE?
10 km.
Is there a toll on the BKE?
There are no toll booths on Singapore expressways. ERP charges apply only at specific points and times; check current rates before you travel.
How current are the BKE incidents on this page?
Each section prints the LTA source time. The server adds a snapshot to the page, and your browser refreshes it from the same official feed every two minutes while the page is open.
Useful to know
Before you set offHow is this road page filtered?
We match BKE in the published text or expressway field. Reports without that road name may not appear here. Check the all-road incident feed for a wider view.
Where are the cameras for this road?
We show only cameras currently returned by the official public feed, not a promised camera at every junction. Open the camera directory to see the available locations.
Source: LTA roads and motoring. Coverage & data policy. Singapore Open Data Licence.