East Coast Parkway
ECP traffic.
Know before you go.
Eastern coastal journeys and connections towards the city and Changi area.
ECP AT A GLANCE
The ECP is the coastal expressway from Changi Airport to the city: about 16 km along East Coast Park, crossing the 1.8 km Benjamin Sheares Bridge, to Marina and Kallang where it meets the KPE and MCE. It is the main airport–city road.
Live LTA reports and segment travel times for the ECP are further down, followed by weather along the route and the order of its interchanges.
ECP RIGHT NOW
ECP status now
Server snapshot · incidents: retrieved 29 Nov, 12:56 SGT · travel times: retrieved 29 Nov, 12:58 SGT
| Expressway | LTA incident reports on the road | End-to-end LTA estimate |
|---|---|---|
| ECP East Coast Parkway | 1 Roadwork | towards CHANGI AIRPORT: 17 min (13 segments) towards CITY: 15 min (9 segments) |
Reports are counted when LTA’s message says the incident is on that road. End-to-end time is the sum of LTA’s published segment estimates in each direction, not a door-to-door prediction.
For airport travel, allow separately for terminal access, parking and check-in. Expressway estimates do not include these steps.
Reports mentioning ECP
Server snapshot · retrieved 29 Nov, 12:56 SGT (source gives no event time)
2 reports — Roadwork 2.
RoadworkWorks(29/11)12:25 Road Works on PIE (towards Tuas) after KPE(ECP).
View incident location ↗RoadworkLane affected(29/11)08:27 Road Works on ECP (towards Changi) after Bayshore Rd. Avoid lane 3.
View incident location ↗Source: LTA DataMall. Coverage & data policy. Singapore Open Data Licence.
ECP travel-time segments
Server snapshot · retrieved 29 Nov, 12:58 SGT (source gives no event time)
ECP towards CHANGI AIRPORT
| From | To | LTA estimate |
|---|---|---|
| ROCHOR RD | ECP/KPE INTERCHANGE | 2 min |
| ECP/KPE INTERCHANGE | FORT RD | 0 min |
| FORT RD | TANJONG KATONG ROAD | 2 min |
| TANJONG KATONG ROAD | MARINE PARADE | 2 min |
| MARINE PARADE | MARINE VISTA | 1 min |
| MARINE VISTA | SIGLAP RD | 1 min |
| SIGLAP RD | BEDOK RD | 1 min |
| BEDOK RD | ECP SERVICE RD | 1 min |
| ECP SERVICE RD | BAYSHORE RD | 1 min |
| BAYSHORE RD | XILIN AVE | 3 min |
| XILIN AVE | CHANGI VILLAGE | 0 min |
| CHANGI VILLAGE | ECP/PIE INTERCHANGE | 2 min |
| ECP/PIE INTERCHANGE | CHANGI AIRPORT | 1 min |
| Sum of the 13 published segments | 17 min | |
ECP towards CITY
| From | To | LTA estimate |
|---|---|---|
| CHANGI AIRPORT | ECP/PIE INTERCHANGE | 1 min |
| ECP/PIE INTERCHANGE | XILIN AVE | 1 min |
| XILIN AVE | ECP SERVICE RD | 2 min |
| ECP SERVICE RD | BEDOK RD | 3 min |
| BEDOK RD | MARINE PARADE | 3 min |
| MARINE PARADE | FORT RD | 2 min |
| FORT RD | ECP/MCE INTERCHANGE | 1 min |
| ECP/MCE INTERCHANGE | ECP/KPE INTERCHANGE | 0 min |
| ECP/KPE INTERCHANGE | ROCHOR RD | 2 min |
| Sum of the 9 published segments | 15 min | |
PIE towards CHANGI AIRPORT
| From | To | LTA estimate |
|---|---|---|
| PIE/TPE INTERCHANGE | PIE/ECP INTERCHANGE | 2 min |
PIE towards PIE/AYE INTERCHANGE
| From | To | LTA estimate |
|---|---|---|
| PIE/ECP INTERCHANGE | CHANGI SOUTH | 1 min |
Segment estimates are published by LTA for the listed points. The sum is arithmetic on those estimates, not a guaranteed door-to-door time.
Source: LTA DataMall. Coverage & data policy. Singapore Open Data Licence.
Check the next part of your trip.
Connecting roads may tell a different story.
ROAD FACTS
ECP facts
| Official name | East Coast Parkway |
|---|---|
| Length | about 16 km (since the MCE took over its western end in 2013) |
| Opened | First phase December 1975; completed 1981 |
| Ends | Changi Airport — continues as Airport Boulevard Marina / Kallang — meets the KPE and MCE, ending at Sheares Avenue |
| Areas served | Changi, Tampines, Bedok, Marine Parade, Kallang, Downtown Core, Marina Bay |
| Connects with | PIE, MCE, KPE |
| Operated by | Land Transport Authority (LTA) |
| Charges | No toll booths. Road pricing applies only at specific ERP charging points and times. LTA plans to end gantry-based charging on 31 December 2026 and switch to ERP 2 with on-board units on 1 January 2027 (LTA). See ERP rates and planning. |
WEATHER ALONG THE ROUTE
Weather along the ECP
NEA 2-hour forecast areas along the ECP, listed east → west.
Forecast points, in route order: Changi → Bedok → Marine Parade → Kallang → City. The current NEA 2-hour forecast for each point is added by the server when NEA responds; if not, see the NEA weather page or the rain and road checker.
Temperature, rain and wind at the start, middle and end
The detailed point forecast was not available when this page was generated.
Heavy rain can cause ponding and lower visibility, but a forecast is not a road closure. For official flood warnings see PUB flood alerts.
ROUTE ORDER
ECP interchanges and main exits
- East end · Airport Boulevard
- PIE Exit 1 · Changi Flyover
- Exit 2A · Tanah Merah Coast Rd / Changi Coast Rd
- Exit 7B · Bedok South Ave 1
- Exit 11 · Marine Parade / Still Rd South
- Exits 13/14A · Fort Rd
- MCE Exit 14B
- KPE Exit 14
- Benjamin Sheares Bridge
- Exit 15 · Rochor Rd
- West end · Sheares Ave
Order: east → west. Exit numbers are as listed in published exit tables; on-road LTA signage is authoritative.
Tunnels, bridges and notable structures
- Benjamin Sheares Bridge — 1.8 km, Singapore’s longest and tallest bridge (29 m), opened 26 September 1981
- Changi Flyover and Tanjong Rhu Flyover
Practical notes for this road
- Travelling to the airport? Allow separately for terminal access, parking and check-in. Expressway estimates do not include these steps.
- The Benjamin Sheares Bridge is exposed to wind and heavy rain. Reduce speed when NEA forecasts thundery showers for Kallang or the City.
Reference sources: Wikipedia: East Coast Parkway · Wikipedia: Benjamin Sheares Bridge · NLB Infopedia: East Coast Parkway. Reviewed 2026-11-01.
ECP questions
Where does the ECP start and end?
Changi Airport — continues as Airport Boulevard; Marina / Kallang — meets the KPE and MCE, ending at Sheares Avenue. Interchanges are listed above in east → west order.
How long is the ECP?
about 16 km (since the MCE took over its western end in 2013).
Is there a toll on the ECP?
There are no toll booths on Singapore expressways. ERP charges apply only at specific points and times; check current rates before you travel.
How current are the ECP incidents on this page?
Each section prints the LTA source time. The server adds a snapshot to the page, and your browser refreshes it from the same official feed every two minutes while the page is open.
Useful to know
Before you set offHow is this road page filtered?
We match ECP in the published text or expressway field. Reports without that road name may not appear here. Check the all-road incident feed for a wider view.
Where are the cameras for this road?
We show only cameras currently returned by the official public feed, not a promised camera at every junction. Open the camera directory to see the available locations.
Source: LTA roads and motoring. Coverage & data policy. Singapore Open Data Licence.