EWL · SINGAPORE MRT
East–West Line.
Check before you travel.
East–west journeys and connecting airport services.
EWL AT A GLANCE
The East–West Line is the green MRT line, operated by SMRT Trains since 1987: Pasir Ris – Tuas Link, plus the Tanah Merah – Changi Airport branch. It is mostly elevated; underground from Lavender to Tiong Bahru and at Changi Airport.
Below: the current LTA service-status snapshot for the EWL, lift maintenance notices, interchange stations and planned changes.
Advisories mentioning EWL
Server snapshot · retrieved 29 Nov, 13:04 SGT (source gives no event time)
EWL: no disruption reported in this snapshot
LTA's train service alert feed returned status 1 (normal service) and no affected segments for this line. Station announcements remain the authority for platform-level delays.
Source: LTA DataMall. Coverage & data policy. Singapore Open Data Licence.
Published station crowd levels
Checking the official source…
Data loads independently. You can explore the rest of the page now.
Source: LTA DataMall. Coverage & data policy. Singapore Open Data Licence.
A useful alternative starts with current information.
LINE FACTS
EWL facts
| Line colour | Green |
|---|---|
| Route length | 57.2 km |
| Stations | 35 |
| First opened | 1987 |
| Operator | SMRT Trains |
| Termini | Pasir Ris – Tuas Link, plus the Tanah Merah – Changi Airport branch |
| Train operation | Train operators on board; CBTC signalling since 2018 |
| Alignment | Mostly elevated; underground from Lavender to Tiong Bahru and at Changi Airport |
CONNECTIONS
EWL interchange stations
| Interchange station | Change to |
|---|---|
| Tampines | DTL |
| Tanah Merah | Changi Airport branch |
| Expo | DTL |
| Paya Lebar | CCL |
| Bugis | DTL |
| City Hall | NSL |
| Raffles Place | NSL |
| Outram Park | NEL, TEL |
| Buona Vista | CCL |
| Jurong East | NSL |
Opened recently and planned
- Jurong Region Line interchange at Boon Lay — LTA target mid-2028
- Cross Island Line interchange at Pasir Ris — LTA target 2030
- The Changi Airport branch is planned to become part of the TEL in the mid-2030s, timed with Changi Terminal 5
Target dates are LTA announcements, not guarantees; check LTA before relying on a new station.
Reference sources: Wikipedia: East–West Line. Reviewed 2026-11-01.
EWL questions
Who operates the EWL?
SMRT Trains. Service-status information on this page comes from LTA DataMall train service alerts.
Where are the EWL interchange stations?
Tampines (DTL); Tanah Merah (Changi Airport branch); Expo (DTL); Paya Lebar (CCL); Bugis (DTL); City Hall (NSL); Raffles Place (NSL); Outram Park (NEL, TEL); Buona Vista (CCL); Jurong East (NSL).
Is the EWL driverless?
Train operators on board; CBTC signalling since 2018.
What should I do during an EWL disruption?
Check the affected stations and direction in the status section above. During major disruptions LTA and the operator announce free bridging buses and free regular bus rides between affected stations; follow station announcements.